Power increase and reduction are operations performed in environments where potential power is considered insufficient. It can be applied in various fields such as office, factory, shop, warehouse and shopping mall. They are the preferred methods for increasing the power to the desired level. These are the operations performed in the company of engineers and technicians
What is an Electrical Power Boost?
Operations called power increase can be performed in electrical installations, as well as a can be performed in transformers at the same time. After the power increase and tenzili project is prepared, it is ensured that the current power reaches the desired level. If there is a need to increase any power in the electrical installation, there are a number of procedures that must be applied. When the project preparation procedure is examined, it turns out that it should be prepared by authorized electrical companies and engineers. As a result of power increase projects, it is seen that the electrical installation or transformer reaches the desired capacity.
How About the Need for a Power Increase and Tenzili?
Devices connected to the electrical installation consume certain amounts of energy. There may be cases when the consumed electrical energy is insufficient. In the face of such situations, an increase in strength is needed. When the power of the used installation is insufficient, the energy used and the installed power collide during the requested determination operations. An increase should be made in the living areas in proportion to the total power of electrical appliances, machines and devices used in environments such as homes and workplaces. Making a compatible power increase is very important during operations. It is possible to request a power increase even in the connection power of the meters.
What is the Power Increase Project?
Energy distribution companies offer electricity connection or energy for electricity subscribers separately and in a certain capacity. The electrical installation is deasigned according to the procedure Decoupled between the distribution company and the subscriber. Although it is a situation that works in a certain way, the expected energy efficiency may not be achieved in some cases. Subscribers cannot reach the required energy from the electrical installation or transformer. In the face of the current situation, the power increase project is applied. When reviewing project requests, some procedures are taken into account first. The steps followed in the power increase project requests are as follows;
- Before the preparations for the power increase project, the authorized company personnel performs on-site reconnaissance studies,
- The desired energy capacity is specified in the electrical installation and a suitable project drawing is made,
- The electrical installation or transformer is made suitable for the project that has been drawn,
- Energy distribution companies are contacted and then the installation inspection and compliance with the procedures are checked,
- Subscribers make an application to the energy distribution company after the transactions and the contract is revised in accordance with the power increase capacity.
About the Power Increase Project
Some information about the power increase project should be known. When the energy consumption of the new generation devices that are actively used in homes and workplaces where old installations are located is taken into consideration; it is seen that the installation is insufficient in terms of energy. In the face of this situation, a power increase project should be made. Making transactions to sealed installations without the knowledge of energy companies can lead to very risky situations. Interfering with installations and increasing power without a project is quite dangerous. When the electrical installation and equipment are insufficient, the main fuse is constantly discarded. It is the most basic answer to be given to the question of what happens if the power increase and reduction are not made.
When a capacity change is made in the electrical installation, the transformer power increase and tenzili project must be prepared precisely. Subscribers who do not comply with the obligations contained in the transformer power increase project are covered with various provisions due to irregular electricity consumption. According to the energy distribution company, subscribers can request a power increase no more than 3 times within 1 year. For changes made to transformers or electrical installations, professional help should always be sought and information about changes should be given to the necessary places. Otherwise, subscribers may face various sanctions. Apart from sanctions and provisions, these are issues that should be treated sensitively in terms of life and property security.
Documents Required For Power Increase
Some documents are needed for power increase operations to be performed in electrical installations. Subscribers who request a power increase should be careful about the documents. Missing or incorrect documents cause problems during transactions. The documents required for the power increase are as follows;
- Photocopy of tax registration plates for workplaces,
- A copy of the tap or lease agreement for residential buildings,
- Workplace activity certificate,
- Signature circular,
- Trade Registry Gazette,
- Photocopy of the identity card of the property owner who made the request,
- If necessary, it is a power of attorney.
After checking the documents of the subscribers who have applied, it performs a visit for determination in order to see them on the spot. After the checks, if the documents and reality are the same, transactions can be started. In case of encountering differences and incorrect situations, no action will be taken. After the building discovery is made, the electrical installation project is started to be drawn in accordance with the desired power. The changes to be made in the electrical installation are made in the most appropriate way for the new project. In order to apply for the projects, the distribution company authorized in the region should be contacted first. After the application is made with the projects, an installation inspection is carried out. The remaining contracts from the old project must be renewed. It is one of the situations that should not be forgotten during the power increase project.
Power Boost Charges
It is not appropriate to share information about the new fees for subscribers who have entered into a power increase contract. Different issues, such as connection strength, are factors that determine prices. Paid paid security fee is the purpose of the payment; the subscriber has the risk of not being able to pay the invoice. If subscribers are curious about the guarantee money they will pay; The value per kW of the one announced by the EMRA should be multiplied by the power contained in the yen contract. Paid paid price will be refunded when the contract is terminated.
Just as a power increase is made, a power decrease is made in the opposite cases. There may be different changes in the electrical energy consumed by subscribers. The event that supports the correct operation of the installation is the voltage drop. All of the conductors through which the electric current passes have a resistance to the current. There is a voltage Deceleration between the two conductive ends.